Knorr Bremse GmbH
Mödling, Austria
The main idea was to implement a new entrance area with a clearly defined footpath and an accentuate entrance situation.
The new entrance area contains three elements:
- newly positioned locomotive and water area; both in the middle of a green area
- new transformer design
- glass façade in the entrance and water area as well as establishing a new entrance to the building
A newly developed footpath leads directly through all the elements to the entrance. The visitor will experience the whole building as a unit.